1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25 | Licensing Program Analyst (LPA) Kruz Long conducted an announced case- management licensee-initiated inspection to the above facility on 06/04/24 due to licensee is requesting capacity increase. Upon arrival, LPA met with licensee, Cathy Nguyen who guided analyst on a tour of the facility. A COVID 19 risk assessment was conducted prior to entering the facility. Also present during this inspection was Licensee’s Assistant (Phillip Pak) and 6 children. Per licensee, facility hours are Monday to Friday from 8:00 a.m. to 5:30 p.m.
Fire Clearance for Large Family Child Care Home was granted on 05/30/2024.
All areas identified on the facility sketch was inspected, including but not limited to, all off limit areas. This is a two-story home that consists of 3 bedrooms, 2 bathrooms, kitchen, living room, dining room, and garage.
Main care is provided in the first floor containing a living room, dining area, bathroom, and rear yard.
Off limit areas: Second floor and garage. (Barrier at the bottom of the stairs was observed)
The licensee was observed to be operating within the licensed capacity and is not exceeding the required limitations during this inspection. All adults present have obtained a criminal record clearance on Licensing Information System (LIS). Per applicant there are no pets, no weapons or firearms on the premise. The home is clean and well ventilated. There are age appropriate toys (blocks, dramatic play area, slides, kitchen set). Age appropriate napping equipment (cots and playpens). Smoke/Carbon Monoxide detectors located in the dining area is operable. The required fire extinguisher (2A10BC) is fully charged. Home has central AC and heat. CPR/First Aid expire on 08/17/25. Children will sleep on the cots and playpens. Breakfast, lunch and snacks will be provided. Parents/Guardians will drop off and pick up children through the front entrance. The home contains a cell phone. Cleaning compounds and knives are locked in the kitchen cabinets. Last drill documented was conducted on 05/30/24.
page 1 of 2 |